Find
img
Construction of a boiler house comprising a boiler with thermal oil coolant
img
Energy Centre, Bilibino, Russia with installed thermal capacity of 91 MW and electric capacity of 25 MW
img
Construction of a 105 MW hot-water boiler house in Atyrau city of the Republic of Kazakhstan
img
Boiler house and heat supply networks for residential complexes, Qtep.= 94.4 MW Minsk, Belarus
img
Mini-CHP plant for the Sveza Uralski plant, LLC, Russia
Individual
Approach
The projects developed by our company easily implement even the most ambitious architectural and engineering intents. 
Design experience in various fields has been the primary specialisation of ENECA for more than 20 years. We are here to create unique and technologically advanced projects using BIM (Building Information Model).
Power Engineering
Immersive design encompassing all aspects, utilizing cutting-edge BIM technologies at every level of LOD
img img img img img img img img img img img img
225+
projects
implemented
20+
years of experience
8+
countries
1 953 MW
total capacity
of projects
DESIGN STAGES
01. Pre-design stage
More details
02. Basic and Detailed Design Documentation
More details
03. Technical and Engineering Support
More details
Work methods and process
1. Quality

High quality of information models is our priority. With the help of BIM we provide our customers with a full assessment of the intended architectural, construction and functional solutions even before they are realised. Quality control of models at every stage of design ensures that all elements of the project comply with the established norms and standards. This not only reduces the risks of errors and mistakes, but also increases the overall level of confidence in the project, providing the customer with the assurance that the final result will meet all expectations and requirements.

2. Cost

We help optimise and control costs throughout the entire project lifecycle. From concept to operation of the energy complex, our job is to ensure that the project is not only high-tech and aesthetically pleasing, but also economically viable. This includes accurate budget planning, minimising additional costs and effective resource management. This approach allows customers to avoid cost overruns and maximise the return on their investment, making the project financially sustainable and profitable.

3. Partners and technology

We are always open to partnerships with different companies within the ENECA values.

ENECA has experience in developing technological solutions with all major equipment manufacturers: Siemens, Caterpillar, Jenbacher, MWM, MTU, Hitachi, Capstone, Howden, Kablitz, Bosch, Viessmann, Ferroli, Buderus, Vaillant, Unical, Entroros, Belkotlomash, Komkont, Geyser, Dorogobuzhkotlomash and others.

In our work we always follow the interests of the Customer and keep the object and its solutions in exclusive confidentiality with respect to other interested parties.

4. Service

Pre-design studies; recommendations of contacts of proven suppliers of equipment and construction and assembly organisations in the energy sector, with whom we cooperate and have implemented projects over the entire period of our existence; online monitoring of the timing and quality of work through the BIM 360 platform (review of documentation and models); authoring, engineering and technical supervision (presence of local experts at the facilities under construction); insurance of risks of design errors (professional liability insurance policy).

5. Role in implementation
We can act as a General Designer, sub-designer or as a member of a consortium to realise a turnkey project. The company is a General Contractor or subcontractor for many projects in the markets of Central and Eastern Europe and Asia.
6. Licences
ENECA holds licences for the right of general design of conventional energy facilities in the Republic of Belarus, Russia, Uzbekistan and Kazakhstan.
they trust us
Client
UE "STiM"
Location
Belarus, Brest
Category
Power Engineering

The management of UE "STiM" would like to thank the specialists of the company ‘ENECA’ who took part in the development and coordination of project documentation and recommends the company ENECA for involvement as a contractor for the design of production complexes and warehouses.