Installation for Landfill Gas Recovery and Electricity and Heat Generation at the Novo-Mileevka
Design and estimate documentation for the "Installation for Landfill Gas Recovery and Electricity and Heat Generation at the Novo-Mileevka Solid Waste Landfill in Mogilev District."
The project involves a biogas complex for recovering landfill gas from the solid waste landfill body and generating electricity and heat (heat is dissipated through dry cooling towers) through regeneration in a cogeneration unit (hereinafter referred to as the CHP block-container). The complex layout includes: a CHP block-container equipped with a gas piston generator; a gas compressor unit (GCU) block-container; an open-type transformer substation; a flare stack; condensate and blow-down wells; and the construction of a gas pipeline system and gas wells.
The biogas plant generates 835 kW of electricity.
The biogas complex produces 835 kW/h of 10 kV electricity.
While working on the project, we used Teamviewer for coordination and Skype for communication. The team of ENECA was very flexible, diligent and client-oriented. Though there were some difficulties with communication and work flow at the beginning, we managed to establish a well-coordinated process afterwards. Work with ENECA was a good alternative to the direct hiring locally. I would recommend working with ENECA as your reliable outsourcing partner.