Individual
Approach
The projects developed by our company easily implement even the most ambitious architectural and engineering intents. 
Design experience in various fields has been the primary specialisation of ENECA for more than 20 years. We are here to create unique and technologically advanced projects using BIM (Building Information Model).
Immersive design encompassing all aspects, utilizing cutting-edge BIM technologies at every level of LOD
img img img img img img img img img img img img
20+
local waste treatment
plants designed
2500 km
networks design
20+
years of experience
92+
electrical substations
and electric power transmission lines
DESIGN STAGES
01. Pre-design stage
More details
02. Basic and Detailed Design Documentation
More details
03. Technical and Engineering Support
More details
Work methods and process
1. Process Engineering

ENECA pays special attention to the nature and technology of the production process. The production process determines the aggressiveness of the environment and the intensity of operation of the infrastructure facility equipment. The selection and calculations of industrial equipment are made, the automation of the work process is planned, the possibility of providing materials and raw materials, energy. The belonging of the infrastructure facility to a certain class of hazard is established, depending on which the size of sanitary zones is provided.

2. Concept

We assess your expectations for profitability and payback period, your anticipated budget, and the selected land plot. Based on these data, we offer several architectural and planning options within the selected class. We estimate the scope of work to create the necessary infrastructure.

3. Pre-project works

These may include geological and environmental surveys, verification of the legal status of the site, determination of logistical indicators of the area, transport accessibility, etc. Drawing up a technical specification based on the obtained information, we determine the storey and area of the object, its architectural appearance, layout. What materials and technologies should be used in the construction process. What works are to be carried out on the adjacent territory.

4. Detailed elaboration of Design and Working documentation

At these stages all architectural, volume-planning, engineering and technical solutions are specified. The methods of fire safety, accessible environment are detailed, the work on territory improvement is planned. The documents created on this Project documentation are submitted for approval to the relevant authorities. The working design includes detailed sweeps, schemes of all units, drawings of the facade part, engineering networks (from water supply to telephony and signalling), interiors.

5. BIM

BIM technologies are used to solve complex tasks in the design of administrative facilities, which help us to assess the cost-effectiveness of the project at an early stage, to find the best option between the cost of the facility, its aesthetics and convenience for the customer. At the same time, the customer has the opportunity to see a full-fledged model of the future facility and evaluate architectural and construction solutions.